Downtime Cost Calculator
See what a machine stoppage really costs — lost margin plus idle labor.
Расчёт
Как получилось ваше число
- Lost production margin2 × 50 × USD 20= USD 2,000
- Idle labor cost2 × USD 150= USD 300
- Cost of this stoppageUSD 2,000 + USD 300= USD 2,300
- Projected annual costUSD 2,300 × 4 × 12= USD 110,400
Что означает этот показатель
This adds lost production margin to idle labor cost to show the full financial hit of a stoppage — not just the repair bill.
A small daily stoppage often adds up to a large annual number that's easy to underestimate.
Как его улучшить
- 01Cutting response time (hours per event) helps as much as preventing the event itself.
- 02Track events per month to see if the pattern is getting better or worse.
Частые вопросы
How is downtime cost calculated?
Lost production margin (units × margin) plus idle labor cost, for the length of the stoppage.
What counts as a downtime cost?
Lost production margin and wages for staff who can't work — not just the repair itself.
Why project the cost over a year?
A small, frequent stoppage can quietly cost more per year than one big rare one.
How can I reduce downtime cost?
Faster response time matters as much as preventing the stoppage in the first place.
How does WAJ help manufacturers?
WAJ has a manufacturing module already in use by factories running their operations on the platform.
See WAJ's manufacturing module in action.
WAJ has a manufacturing module already used by factories to run their operations on the platform — this calculator is one of the free tools built by the same team.